Tuesday, 23 July 2013

UK Transport policies in the slow lane? No.

Regrettably not.

Almost all transport plans and developments are not in any lane.

They are stuck in the car park.

A few lesser ones , mainly on the railways are under way, but many haven't even got to the decision making stage or, beyond that , starting the planning process. They are firmly in the car park and not even at the exit.

Why?

Scene: The Prime Minster's office:

Sir Howard Davies (Leader of the Airports Commission, due to make its recommendations on London capacity in 2015 despite a list of options being published this year):

"We've got the submissions from Heathrow, Gatwick and Stansted Sir. We've also got our own work on alternatives like White Waltham , Haddenham and a few others ".(Why is Roskill 1973- recommmended Wing/Cublington never mentioned?). "We could put the whole lot together and make our recommendations this year if you like".

PM: "What is there about Not Before The 2015 General Election that you don't understand ? Once that's out of the way we can do anything we like, -and if we can't Labour will do it anyway. They were on the brink of going ahead at Heathrow but we put a stop to that. Think of that, we would be doing something -the diggers would be in right now. Terrible. Go away and waste some more time like you were told to do".

           "Sorry sir. My mistake, See you,-or someone,- in 2015."

Meanwhile over at HS 2, Britain's planned second domestic high speed railway line, a hybrid bill to enable building to start needs to start its journey through parliament this autumn if it is to be passed in the lifetime of this government.If it isn't completed by May 2015 it will have to start again. At the moment there is no sign of the required urgency. In the meantime the very well planned and orchestrated opposition lobby centred in the Chilterns ,through which all but 3.1 of  its 12.4 mile passage will be in expensive tunnels or cuttings, is steadily ploughing ahead and building opposition into a sort of dinner party fashion amongst public figures despite its objectives being primarily parochial even when wrapped in a respectable cover of national interest . The need for more track and line capacity is immediate and there are no real options .

Processes for transport projects are glacial and most are opposed and fought all the way. Even minor schemes face up to six years of planning processes, hearings, appeals and judicial reviews .Talk of building infrastructure and capacity for future generations cuts little ice in the Treasury or amongst opponents.

Very little other than filling in about £10 bn worth of potholes on the roads is immediately shovel ready . Even there money is squandered by botch filling rather than proper lasting repairs. Africa learned pothole repairing techology decades ago. First world UK doesn't yet seem to understand it.

As for major road strategy and development, a major programme of improvements has been announced . Much of it is along the routes Airnthere outlined on 1st July. It would focus more on upgrading single carriageway A roads to near motorway dual carriageway standards than building new motorways but it would do great things for the areas concerned. "Not so fast" retort the "Say No To.." groups. Any improvement anywhere near to a national park, the Lake District, the Norfolk Broads, the South Downs or "area of outstanding natural beauty" is claimed to be "devastating" it even if it just goes around the edges as do all of the projects concerned .The A595 doesn't cut through the lakes . It improves access to them but goes around the  struggling Cumbrian Coast . The A47 from Acle to Yarmouth  is already there , improves access to some of the broads country and especially to run down, drab Yarmouth . It doesn't wreck the Broads . Similarly the A27/259  runs to the north of the South Downs, improves access to them and benefits east-west coastal traffic, access to the Channel tunnel and gives a string of towns an economic boost.  It does nothing to the downs themselves. Unblocking the bottleneck to going to depressed Hastings by dualling its lst 20 miles is claimed to be destroying the Weald and ancient woodlands of Kent and Sussex. It would do nothing of the sort but would boost employment in Hastings. And so it goes on nationwide.  These and other depressed areas need all the help they can get to boost their economies, remove barriers to business and trade and to create large numbers of new jobs.  Many feet are though out to trip them up.

Unfortunately for the UK ,the opposing well heeled "Say no To.." groups, the tortuous planning processes and general inertia and lack of courage in Whitehall and Parliament all conspire to make even the opening of a village bypass a very long process. As result,despite some bold declarations of intent, promising billions to be spent ,not a lot of the big things are actually  happening. Fortunately a few smaller ones are. For  that we can thank pure dogged determination or ,occasionally, stealth. The biggest missing ingredients are political courage and Whitehall's abilty to do anything quickly and simply. It's just not part of the culture.